ON-SITE SUPPORT AND INTEGRATION
With an emphasis on accurate site measurement & drafting, we can be on-site anywhere in Australia within 24 hours. We are able to visit you on site for project evaluation & all site measuring if required. Our staff are available for day visits right through to ongoing FIFO if required.
Whether it's Plant upgrades or integration of the new project into existing structure, from small stair & platform jobs, to the design of bins, chutes & materials handling, Bockdraft has the capacity to follow a project from inception to completion.
Our staff regularly undergo Inductions for numerous companies such as BHPBIO, RTIO & HWE & maintain nationally recognised safety training in Confined Space Access & Working Safely at Heights.

EXISTING CONVEYOR
Client requested an outer walkway to be constructed to allow maintenance access on the outside of two existing dust conveyors.

CONCEPTUAL WALKWAY PROPOSAL
Typical walkway proposal (Shown in red & yellow). All existing steelwork measured and modelled. The new walkway was designed to fit around existing steelwork & services to eliminate moving or modifying cable trays, piping & switches.
APEX MINERALS - WILUNA GOLD MINe
This project required full site measurement and confirmation to facilitate with the tie-in of a new 450T surge bin, conveyor, belt feeders & structural support structures.

APEX MINERALS - SURGE BIN/CONVEYOR TIE-IN
Fine ore feed process system designed & detailed for workshop fabrication.